Inquiry
Form loading...
Module Categories
Featured Module
A new chemical material wastewater treatment project in Shandong with low consumption and up to standard

A new chemical material wastewater treatment project in Shandong with low consumption and up to standard

2026-01-12

Project scale: 5000 M3/d;

The traditional anaerobic UASB + AO process is transformed into: "anaerobic ammonium oxidation + deep biochemical" process to save carbon resources

view detail
Anaerobic ammonium oxidation treatment project for a landfill leachate in Hubei

Anaerobic ammonium oxidation treatment project for a landfill leachate in Hubei

2026-01-12

Project scale: 150 M3/d;

Covered area: 1988M2;

Two-stage anaerobic digestion + aerobic carbon removal + IFAS integrated anaerobic ammonium oxidation process

view detail
Pharmaceutical wastewater treatment anaerobic ammonium oxidation standard improvement project

Pharmaceutical wastewater treatment anaerobic ammonium oxidation standard improvement project

2026-01-12

Project scale: 100-300 M3/d;

Covered area: 1988M2;

Electrochemical oxidation + ABR process + two-stage AO/MBR, saving floor space

view detail